Line 3 (Mumbai Metro)
Metro 3 of the Mumbai Metro, also referred to as the Colaba–Bandra-SEEPZ line, is a part of the metro system for the city of Mumbai, India of which construction has been initiated.[4][5]When completed, the 33.5-km long line will be the first underground metro line in Mumbai.[6]The metro line will connect Cuffe Parade business district in the extreme south of the city to SEEPZ in the north-central[7] with 26 underground and one at-grade station.[8] The track width is standard gauge. The cost of this corridor is estimated at ₹23,136 crore(US$3.2 billion).[9][10] Line 3 is expected to reduce road congestion, besides reducing the load on the Western Line between Bandra and Churchgate.[11][12]
The project is being implemented by the Mumbai Metro Rail Corporation Limited (MMRCL). The line starts at Cuffe Parade, will run through Nariman Point, Churchgate, CST, Girgam, Worli, Dadar, Mahim, Kalina University, Bandra, Bandra-Kurla Complex, Santacruz East and past the domestic and international terminals of Mumbai Airport, through Andheri MIDC and terminates atSEEPZ.[11][13]
A 1.2 km section of the line between Bandra Kurla Complex and Dharavi stations will pass under the Mithi river. This will be the second underwater metro rail tunnel in India after the tunnel below the Hooghly river on Kolkata Metro Line 2.[14]
The 33.5 km, Rs. 23,136 crore project involves five major entities - MMRCL (Mumbai Metro Rail Corporation Limited), Padeco, MMRDA, CREC (China), [15]. Major (65%) funding for the project was received through a soft loan of Rs. 13,235 crore from JICA (Japan International Cooperation Agency) with the rest provided by the exchequer through theGovernment of India and Government of Maharashtra.[16][15][17]
No comments:
Post a Comment
Plzz if u like my BLOGS you can follow SAI BLOGGER #Share & #Comment