Sunday, October 21, 2018

Mumbai metro line 3 the underground report

Line 3 (Mumbai Metro)

Metro 3 of the Mumbai Metro, also referred to as the Colaba–Bandra-SEEPZ line, is a part of the metro system for the city of Mumbai, India of which construction has been initiated.[4][5]When completed, the 33.5-km long line will be the first underground metro line in Mumbai.[6]The metro line will connect Cuffe Parade business district in the extreme south of the city to SEEPZ in the north-central[7] with 26 underground and one at-grade station.[8] The track width is standard gauge. The cost of this corridor is estimated at 23,136 crore(US$3.2 billion).[9][10] Line 3 is expected to reduce road congestion, besides reducing the load on the Western Line between Bandra and Churchgate.[11][12]
Metro 3
Overview
Other name(s)Metro 3
Colaba–Bandra-SEEPZ line[1]
TypeRapid transit
SystemMumbai Metro
StatusUnder construction[3]
LocaleMumbaiMaharashtra, India
TerminiCuffe Parade
Aarey Depot
Stations27
Daily ridership1.39 million (2021 estimate)[2]
WebsiteMMRCL
Operation
Planned opening2021
OwnerMumbai Metro Rail Corporation Ltd (MMRC)
CharacterUnderground and at grade
Depot(s)Aarey Milk Colony
Technical
Line length33.05 km (20.54 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8 12 in)standard gauge
ElectrificationOverhead 25kV AC
Mumbai Metro (Line 3)
Cuffe Parade
Vidhan Bhavan
Churchgate
(Connects to Western Line)
Hutatma Chowk
Chhatrapati Shivaji Terminus
(Connects to Central and Harbour lines, and Indian Railways)
Kalbadevi
Girgaon
Grant Road
(Connects to Western Line)
Mumbai Central
(Connects to Western Line and Indian Railways)
Mahalaxmi
(Connects to Western Line and Mumbai Monorail)
Mumbai Suburban Railway (Western Line)
Nehru Science Centre
Acharya Atrey Chowk
Worli
Siddhivinayak Temple
Dadar
(Connects to Central and Western lines, Mumbai Monorail and Indian Railways)
Shitladevi
Dharavi
Mumbai Suburban Railway (Western Line)
Mithi River
Bandra-Kurla Complex
(Connects to Line 2)
Vidyanagari
Santacruz
CSIA T1
(Connects to Line 7)
Sahar Road (GVK Sky City)
(Connects to Line 7)
CSIA T2
(Connects to Line 7)
Marol Naka
(Connects to Line 1)
MIDC
SEEPZ
Aarey Depot
The project is being implemented by the Mumbai Metro Rail Corporation Limited (MMRCL). The line starts at Cuffe Parade, will run through Nariman Point, Churchgate, CST, Girgam, Worli, Dadar, Mahim, Kalina University, Bandra, Bandra-Kurla Complex, Santacruz East and past the domestic and international terminals of Mumbai Airport, through Andheri MIDC and terminates atSEEPZ.[11][13]
A 1.2 km section of the line between Bandra Kurla Complex and Dharavi stations will pass under the Mithi river. This will be the second underwater metro rail tunnel in India after the tunnel below the Hooghly river on Kolkata Metro Line 2.[14]
The 33.5 km, Rs. 23,136 crore project involves five major entities - MMRCL (Mumbai Metro Rail Corporation Limited), Padeco, MMRDA, CREC (China), [15]. Major (65%) funding for the project was received through a soft loan of Rs. 13,235 crore from JICA (Japan International Cooperation Agency) with the rest provided by the exchequer through theGovernment of India and Government of Maharashtra.[16][15][17]

No comments:

Post a Comment

Plzz if u like my BLOGS you can follow SAI BLOGGER #Share & #Comment

The Silent Revolution: How AI is Making Every Device Smarter Part 2

 no longer just about making calls or sending texts; AI has infused almost every feature: ● Camera Smarts: Ever wondered how your phone take...